Sandvik mining and construction

The plant’s production plans were entered into Pinja’s PES system. The PES system takes care of the coarser volume scheduling as well as the fine-tuned scheduling.

Export to PES

The plant’s production plans were entered into Pinja’s PES system. The PES system takes care of the coarser volume scheduling as well as the fine-tuned scheduling.

For partner network management

For the purposes of partner network management, the plant was equipped with the Partnerportal programme included in the PES system, through which the production plans are available also to the subcontractors.

Thanks to PES, transparency has improved significantly throughout the organisation.

Eero Plathin, Production Manager, Sandvik Mining and Construction, Turku

Challenge: More transparency to production planning

The plant had challenges in production monitoring and the flow of information; the production controller had to find out directly from production how the work was proceeding, and then adapt the production plan accordingly. There was a lot of manual work involved, and not enough information of the problem areas available.

Solution: Pinja’s PES system was implemented to boost the plant’s production and facilitate the flow of information, both in production planning and on the shop-floor level

The plant’s production plans were entered into Pinja’s PES system. The PES system takes care of the coarser volume scheduling as well as the fine-tuned scheduling. Moreover, the monitoring of material deficiencies is also carried out in the system. For the purposes of partner network management, the plant was equipped with the Partnerportal programme included in the PES system, through which the production plans are available also to the subcontractors.

“Thanks to PES, transparency has improved significantly throughout the organisation. We have achieved benefits in terms of capacity and resources – the improvements have been significant in these areas. In addition, we can now pride ourselves with better security of supply and shorter lead times.” Eero Plathin, Operations Support Manager, Sandvik Mining and Construction, Turku

Sandvik in the nutshell

1862 Founded

37 000+ Employees

8,45 B Revenue (2020)

~ 6000 Active patents

Similar success stories

Atria Suomi

The PES system by Pinja offered a solution to Atria's key information needs — to facilitate the daily operational functions…

Snellman – significant cost savings through more efficient production planning

Enhanced production planning has helped Snellman optimize frozen stock by over 20% and reduce losses due to expiration dates by…

Metsä Fibre – the world’s most modern sawmill

As a result of the collaboration between Pinja and the leading producer of wood-based bio-products, Metsä Fibre, a common operating…

Patria Aerostructures

Patria Aerostructures chose Pinja as its implementation partner owing to Pinja’s ability to provide a complete solution for the modernization…